US 80 EBL SR 22 over PED. WALKWAY
NORTH EAST COLUMBUS · County 215, Georgia · Built 1988 · 2 Lanes · 34,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.549208, -84.874064
This bridge is in worse condition than 41.5% of bridges in County 215. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
US 80 SR 22 WB-JR over PED. WALKWAY
Built 1988
US 80 EBL over M-8057 WARM SPRINGS RD
Built 1988
US 80 WBL over M-8057 WARM SPRINGS RD
Built 1988
US 80 over FLATROCK BRANCH
Built 1988
US 80 over FLATROCK CREEK
Built 1988
STONE CREEK LANE over FLAT ROCK CREEK
Built 2005
PIERCE CHAPEL RD over FLATROCK BRANCH
Built 1930
WARM SPRINGS RD over FLATROCK CREEK
Built 1930
US 80 SR 22 over SR 85 (US 27 ALT)@10.70N
Built 1988
STONE CREEK DR over FLAT ROCK CREEK
Built 2005
Bridge Details
- Structure #
- 000000021501580
- Year Built
- 1988
- Length
- 43.9 m (144 ft)
- Max Span
- 18.3 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 34,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $563,000
- Total Project Cost
- $844,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.