US 80 SR 22 WB-JR over PED. WALKWAY

NORTHEAST COLUMBUS · County 215, Georgia · Built 1988 · 2 Lanes · 3,870 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021501590
Year Built
1988
Length
43.9 m (144 ft)
Max Span
18.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,870
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$563,000
Total Project Cost
$844,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.