US 80 SR 22 over SR 85 (US 27 ALT)@10.70N

NORTHEAST COLUMBUS · County 215, Georgia · Built 1988 · 6 Lanes · 34,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021501600
Year Built
1988
Length
72.8 m (238.8 ft)
Max Span
23.8 m
Width
39.6 m (129.9 ft)
Lanes
6
Daily Traffic
34,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,953,000
Total Project Cost
$2,929,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.