SR 38 (US 84) over I-95 (SR 405)

2 MI SE OF MIDWAY · County 179, Georgia · Built 1972 · 2 Lanes · 9,290 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000017900210
Year Built
1972
Reconstructed
2004
Length
80.2 m (263.1 ft)
Max Span
27.4 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
9,290
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,028,000
Total Project Cost
$1,541,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.