I-95 (NBL) over NORTH NEWPORT RIVER

4.6 MI SE OF MIDWAY · County 179, Georgia · Built 1973 · 2 Lanes · 60,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017900380
Year Built
1973
Length
233.2 m (765.1 ft)
Max Span
29 m
Width
24.1 m (79.1 ft)
Lanes
2
Daily Traffic
60,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,989,000
Total Project Cost
$4,484,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.