I-95 (SBL) over CAY CREEK TRIBUTARY

3 MI SE OF MIDWAY · County 179, Georgia · Built 1972 · 3 Lanes · 59,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017900410
Year Built
1972
Reconstructed
2004
Length
48.8 m (160.1 ft)
Max Span
9.8 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
59,800
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$796,000
Total Project Cost
$1,193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.