I-95 (NBL) over JONES CREEK

3.7 MI E OF MIDWAY · County 179, Georgia · Built 1974 · 3 Lanes · 65,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017900420
Year Built
1974
Reconstructed
2004
Length
139 m (456 ft)
Max Span
11.6 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
65,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,268,000
Total Project Cost
$3,401,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.