I-95 (SBL) over TIDAL CANAL

4 MI E OF MIDWAY · County 179, Georgia · Built 1974 · 3 Lanes · 63,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000017900450
Year Built
1974
Reconstructed
2004
Length
106.7 m (350.1 ft)
Max Span
15.2 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
63,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,740,000
Total Project Cost
$2,611,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.