SANDEFUR ROAD over BEULAH BRANCH
2.5 MI N OF PERRY · County 153, Georgia · Built 2011 · 3 Lanes · 832 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
32.5303, -83.71415
This bridge is in worse condition than 33.9% of bridges in County 153. The average bridge in Georgia is 0 years old; this one is 15 years old.
Nearby Bridges
US 41 over BEULAH BRANCH TRIB.
Built 1930
41 CIRCLE over MOSSY CREEK
Built 1995
US 41/ SR 11 over MOSSY CREEK
Built 1995
I-75 NBL over MOSSY CREEK
Built 1995
I-75 SBL over MOSSY CREEK
Built 1995
LAKE JOY ROAD over JOY LAKE
Built 1984
LAKE JOY ROAD over LAKE JOY
Built 1984
SR 96 over I-75 (EXIT 142) @ 141.28
Built 2004
TODD ROAD over I-75 @ 139.14E
Built 1962
S.R. 11 CONNECTOR over I-75 (EXIT 138) @ 137.93
Built 1988
Bridge Details
- Structure #
- 000000015350470
- Year Built
- 2011
- Length
- 24.4 m (80.1 ft)
- Max Span
- 12.2 m
- Width
- 16 m (52.5 ft)
- Lanes
- 3
- Daily Traffic
- 832
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $398,000
- Total Project Cost
- $597,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.