TODD ROAD over I-75 @ 139.14E

2.7 MI N OF PERRY · County 153, Georgia · Built 1962 · 2 Lanes · 490 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300310
Year Built
1962
Length
62.8 m (206 ft)
Max Span
21.3 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
490
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$805,000
Total Project Cost
$1,207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.