I-75 SBL over MOSSY CREEK

5 MI N OF PERRY · County 153, Georgia · Built 1995 · 3 Lanes · 104,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300970
Year Built
1995
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
19.3 m (63.3 ft)
Lanes
3
Daily Traffic
104,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$796,000
Total Project Cost
$1,193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.