S.R. 11 CONNECTOR over I-75 (EXIT 138) @ 137.93

2 MI N OF PERRY · County 153, Georgia · Built 1988 · 3 Lanes · 12,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000015300840
Year Built
1988
Length
62.2 m (204.1 ft)
Max Span
21.3 m
Width
19.3 m (63.3 ft)
Lanes
3
Daily Traffic
12,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,014,000
Total Project Cost
$1,522,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.