US 129 SBL over ECHECONNEE CREEK

NORTH WARNER ROBINS · County 153, Georgia · Built 1995 · 2 Lanes · 3,710 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000015300940
Year Built
1995
Length
132.6 m (435 ft)
Max Span
22.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,710
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,700,000
Total Project Cost
$2,549,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.