US 129 NBL over ECHECONNEE CREEK

NORTH - WARNER ROBINS · County 153, Georgia · Built 1953 · 2 Lanes · 25,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300370
Year Built
1953
Length
122.5 m (401.9 ft)
Max Span
23.5 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
25,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,571,000
Total Project Cost
$2,356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.