US 129 SBL over ECHECONNEE CREEK O/F

7 MI S OF MACON CTY LIMIT · County 021, Georgia · Built 1941 · 2 Lanes · 3,710 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000002100550
Year Built
1941
Reconstructed
1953
Length
64 m (210 ft)
Max Span
9.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
3,710
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$821,000
Total Project Cost
$1,231,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.