US 129 NBL over ECHECONNEE CREEK O/F

6.9 MI S OF MACON CTY LMT · County 021, Georgia · Built 1953 · 2 Lanes · 25,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002100560
Year Built
1953
Length
64 m (210 ft)
Max Span
9.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
25,200
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$821,000
Total Project Cost
$1,231,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.