I-75 over SR 156

IN EAST SIDE OF CALHOUN · County 129, Georgia · Built 2016 · 6 Lanes · 74,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012951050
Year Built
2016
Length
45.4 m (149 ft)
Max Span
45.1 m
Width
47.3 m (155.2 ft)
Lanes
6
Daily Traffic
74,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,246,000
Total Project Cost
$19,869,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.