DEWS POND ROAD over I-75

2 MI E OF CALHOUN · County 129, Georgia · Built 1963 · 2 Lanes · 8,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012900730
Year Built
1963
Length
78.9 m (258.9 ft)
Max Span
21.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
8,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,012,000
Total Project Cost
$1,518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.