I-75 over M-5616 NEW TOWN ROAD

2.5 MI NE OF CALHOUN · County 129, Georgia · Built 1963 · 6 Lanes · 74,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012900580
Year Built
1963
Reconstructed
1987
Length
33.5 m (109.9 ft)
Max Span
12.2 m
Width
42.4 m (139.1 ft)
Lanes
6
Daily Traffic
74,800
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$899,000
Total Project Cost
$1,348,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.