I-75 over SR 225

3 MI NE OF CALHOUN · County 129, Georgia · Built 1963 · 6 Lanes · 72,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012900600
Year Built
1963
Reconstructed
1987
Length
50.6 m (166 ft)
Max Span
18.9 m
Width
42.4 m (139.1 ft)
Lanes
6
Daily Traffic
72,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.