I-75 over SR 3 (US 41)
4 MI N OF CALHOUN · County 129, Georgia · Built 1962 · 6 Lanes · 76,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
34.556639, -84.935922
This bridge is in worse condition than 78.9% of bridges in County 129. The average bridge in Georgia is 0 years old; this one is 64 years old.
Nearby Bridges
I-75 over M-5621- CSX RR (340519C)
Built 1962
I-75 over OOSTANAULA RIVER
Built 1962
I-75 over SR 225
Built 1963
US 41/ SR 3 over OOSTANAULA RIVER
Built 1930
US 41/ SR 3 over CSX RAILROAD (340516G)
Built 1935
SR 136 over I-75
Built 2014
SR 136 over CAMP CREEK
Built 2014
SR 225 over NEW TOWN CREEK
Built 2017
SR 225 over COOSAWATTEE RIVER
Built 2017
I-75 over M-5616 NEW TOWN ROAD
Built 1963
Bridge Details
- Structure #
- 000000012900640
- Year Built
- 1962
- Reconstructed
- 1987
- Length
- 83.2 m (273 ft)
- Max Span
- 31.7 m
- Width
- 42.5 m (139.4 ft)
- Lanes
- 6
- Daily Traffic
- 76,400
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,230,000
- Total Project Cost
- $3,345,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.