SR 53 over BLACKWOOD CREEK

4.5 MI SE OF CALHOUN · County 129, Georgia · Built 1937 · 3 Lanes · 8,260 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000012900150
Year Built
1937
Reconstructed
1985
Length
12.5 m (41 ft)
Max Span
4 m
Lanes
3
Daily Traffic
8,260
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.