UNION GROVE ROAD over I-75

4 MI S OF CALHOUN · County 129, Georgia · Built 2014 · 2 Lanes · 14,104 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012951010
Year Built
2014
Length
57.3 m (188 ft)
Max Span
28.7 m
Width
26 m (85.3 ft)
Lanes
2
Daily Traffic
14,104
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,694,000
Total Project Cost
$25,042,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.