CALHOUN BYPASS over UNION GROVE CHURCH ROAD

4 MI S OF CALHOUN · County 129, Georgia · Built 2020 · 4 Lanes · 14,104 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012951110
Year Built
2020
Length
57.9 m (190 ft)
Max Span
21.3 m
Width
26.5 m (86.9 ft)
Lanes
4
Daily Traffic
14,104
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,872,000
Total Project Cost
$25,308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.