SR 53 over I-75

IN SOUTH EAST CALHOUN · County 129, Georgia · Built 1963 · 6 Lanes · 27,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012900130
Year Built
1963
Reconstructed
2001
Length
73.2 m (240.2 ft)
Max Span
24.1 m
Width
33.5 m (109.9 ft)
Lanes
6
Daily Traffic
27,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,961,000
Total Project Cost
$2,941,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.