SR 53 over CSX RAILROAD (340503F)

@ W CALHOUN CITY LIMITS · County 129, Georgia · Built 1966 · 4 Lanes · 19,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012900120
Year Built
1966
Reconstructed
1988
Length
42.1 m (138.1 ft)
Max Span
14 m
Width
21.4 m (70.2 ft)
Lanes
4
Daily Traffic
19,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.