BUCK SWAMP ROAD over LAUREL GROVE CREEK

8 MI SW OF BRUNSWICK · County 127, Georgia · Built 2018 · 2 Lanes · 250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012750240
Year Built
2018
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
250
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,328,000
Total Project Cost
$7,992,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.