DOVER BLUFF ROAD over I-95 (SR 405)

2 MI E OF US 17 · County 039, Georgia · Built 1975 · 2 Lanes · 1,060 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003900520
Year Built
1975
Length
77.4 m (253.9 ft)
Max Span
26.8 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
1,060
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$992,000
Total Project Cost
$1,489,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.