SIDNEY LANIER BRID over BRUNSWICK RIVER

0.5 S BRUNSWICK CTY LMTS · County 127, Georgia · Built 2002 · 4 Lanes · 14,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012750200
Year Built
2002
Length
2371.3 m (7779.9 ft)
Max Span
381 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
14,700
Material
Prestressed Concrete
Design
Stayed Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$46,979,000
Total Project Cost
$70,468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.