CR 582 TORRAS CAUS over TERRY CREEK

0.5 MI E OF BRUNSWICK · County 127, Georgia · Built 1950 · 4 Lanes · 32,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012700650
Year Built
1950
Reconstructed
1986
Length
98.8 m (324.1 ft)
Max Span
11 m
Width
23 m (75.5 ft)
Lanes
4
Daily Traffic
32,400
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,956,000
Total Project Cost
$2,935,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.