SR 25 SE TORRAS CA over FREDERICA RIVER

3.7 MI E OF BRUNSWICK · County 127, Georgia · Built 1950 · 4 Lanes · 32,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012700610
Year Built
1950
Reconstructed
1986
Length
389.8 m (1278.9 ft)
Max Span
38.7 m
Width
23 m (75.5 ft)
Lanes
4
Daily Traffic
32,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,723,000
Total Project Cost
$11,585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.