SR 25SE TORRAS CAU over BACK RIVER

1.5 MI E OF BRUNSWICK · County 127, Georgia · Built 1986 · 4 Lanes · 32,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012700640
Year Built
1986
Length
483.7 m (1586.9 ft)
Max Span
36.6 m
Width
23 m (75.5 ft)
Lanes
4
Daily Traffic
32,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,583,000
Total Project Cost
$14,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.