BOARDTOWN ROAD over BOARDTOWN CREEK

9.7 MI N OF ELLIJAY · County 123, Georgia · Built 1959 · 2 Lanes · 2,259 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000012300380
Year Built
1959
Length
8.2 m (26.9 ft)
Max Span
8.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,259
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$30,000
Total Project Cost
$72,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.