BOARDTOWN ROAD over BOARDTOWN CREEK

8.5 MI N OF ELLIJAY · County 123, Georgia · Built 1958 · 2 Lanes · 690 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000012300360
Year Built
1958
Length
12.8 m (42 ft)
Max Span
6.4 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
690
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$46,000
Total Project Cost
$98,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.