SR 515 - US 76 (SB over CR 258- ROCK CREEK

8 MI NE OF ELLIJAY · County 123, Georgia · Built 1989 · 3 Lanes · 17,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012300500
Year Built
1989
Length
76.8 m (252 ft)
Max Span
28.7 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
17,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.