BOARDTOWN ROAD over BOARDTOWN CREEK

9.2 MI N OF ELLIJAY · County 123, Georgia · Built 1958 · 2 Lanes · 2,259 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012300370
Year Built
1958
Length
11.6 m (38.1 ft)
Max Span
5.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,259
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$41,000
Total Project Cost
$91,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.