EDGEWOOD AVENUE over ATLANTA BELT-LINE PATH
IN ATLANTA · County 121, Georgia · Built 2013 · 2 Lanes · 1,870 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.754319, -84.365647
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 13 years old.
Nearby Bridges
EDGEWOOD AVE. over CS 3474 AIRLINE STREET
Built 1941
DECATUR STREET over M-9180 BOULEVARD
Built 1930
RANDOLPH STREET over SR 10
Built 1994
HIGHLAND AVE. over SR 10
Built 1994
HIGHLAND AVE. over ATLANTA BELTLINE
Built 1983
JACKSON STREET over SR 10
Built 1963
I-75 over M9184 EDWD- M9150 AUBU
Built 1988
I-75R N TO SR 10 over M-9157 IRWIN ST- I-75R
Built 1988
I-75 over M-9157 IRWIN STREET
Built 1988
BOULEVARD over I-20
Built 1993
Bridge Details
- Structure #
- 000000012153580
- Year Built
- 2013
- Length
- 55.8 m (183.1 ft)
- Max Span
- 40.5 m
- Width
- 17.4 m (57.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,870
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $16,250,000
- Total Project Cost
- $24,376,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.