HIGHLAND AVE. over ATLANTA BELTLINE

IN ATLANTA · County 121, Georgia · Built 1983 · 2 Lanes · 9,320 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012104280
Year Built
1983
Length
54.9 m (180.1 ft)
Max Span
24.7 m
Width
20.2 m (66.3 ft)
Lanes
2
Daily Traffic
9,320
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$703,000
Total Project Cost
$1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.