DEKALB AVE-GA RR over SR 42 MORELAND AVE(US23)

DEKALB-FULTON C/L IN ATL · County 089, Georgia · Built 1959 · 5 Lanes · 15,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008901640
Year Built
1959
Reconstructed
1977
Length
31.1 m (102 ft)
Max Span
15.5 m
Width
74.4 m (244.1 ft)
Lanes
5
Daily Traffic
15,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$725,000
Total Project Cost
$1,087,000