M.L.K. JR. DRIVE over I-75

IN ATLANTA · County 121, Georgia · Built 1989 · 4 Lanes · 18,106 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012107090
Year Built
1989
Length
112.5 m (369.1 ft)
Max Span
56.4 m
Width
25.1 m (82.3 ft)
Lanes
4
Daily Traffic
18,106
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,228,000
Total Project Cost
$3,342,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.