MEMORIAL DRIVE over I-75 + I-75 RMP + I-20 R
IN ATLANTA · County 121, Georgia · Built 1988 · 5 Lanes · 21,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.746892, -84.387356
This bridge is in worse condition than 67.7% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
I-20 WB TO I-75 SB over I-75-3 I75 RMPS- I20 RMP
Built 1988
M.L.K. JR. DRIVE over I-75
Built 1989
I-20R WB TO WINDSO over I-75-3I-75RMP-3I-20RMP-3
Built 1988
I-75 N R TO I-20 W over I-75- 2 I-75 RMPS- I-20R
Built 1988
CAPITOL AVE. over I-20- I-75 RMP- I-20 RMP
Built 1988
FULTON RM TO I-75 over I-75 NB RMP TO I-20 E&WB
Built 1988
I-20 EBL over 3I75RMP-2I20RMP-3MRT-2MR
Built 1988
PRYOR ST TO I-75 S over I-75-I-75R-I-20R-M9163-9
Built 1988
I-75 SB RMP TO I-2 over I-75- 2 I-75 RMPS- I-20R
Built 1988
COURTLAND STREET over DECATUR ST-CSX RR
Built 2018
Bridge Details
- Structure #
- 000000012107080
- Year Built
- 1988
- Length
- 147.5 m (483.9 ft)
- Max Span
- 44.2 m
- Width
- 159.2 m (522.3 ft)
- Lanes
- 5
- Daily Traffic
- 21,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,438,000
- Total Project Cost
- $5,158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.