SR 139 over SR 14- CS 7026- CSX RR.
IN SOUTH COLLEGE PARK · County 121, Georgia · Built 1988 · 5 Lanes · 10,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.633594, -84.466008
This bridge is in worse condition than 67.7% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
CONRAC ACCESS ROAD over I-85 5 RWY 2 RR
Built 2009
SR 139 over I-85- SR 139 RAMP
Built 1976
SR 139 over I-85 RAMP
Built 1976
I-85 over ABANDONED CSX RAILROAD
Built 1961
I-85 (NBL RAMP) over CR 1008 SULLIVAN ROAD
Built 1983
I-85 (SBL RAMP) over CR 1008 SULLIVAN ROAD
Built 1983
I-85 over CR 1008 SULLIVAN ROAD
Built 1984
CR917 N TERMINAL L over S TERMINAL LOOP
Built 2014
CR 517 S TERMINAL over AIRPORT BLVD CONNECTOR
Built 2014
I-285R CB TO I-85 over I-85- 2 I-85 RAMPS
Built 1985
Bridge Details
- Structure #
- 000000012106550
- Year Built
- 1988
- Length
- 120.1 m (394 ft)
- Max Span
- 34.1 m
- Width
- 23.9 m (78.4 ft)
- Lanes
- 5
- Daily Traffic
- 10,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,799,000
- Total Project Cost
- $4,198,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.