CR917 N TERMINAL L over S TERMINAL LOOP

ATLANTA AIRPORT · County 063, Georgia · Built 2014 · 1 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000006350820
Year Built
2014
Length
19.2 m (63 ft)
Max Span
19.2 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
6,805
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$5,594,000
Total Project Cost
$8,392,000