CR517 S TERMINAL C over PRIVATE ROAD

ATLANTA AIRPORT · County 063, Georgia · Built 2014 · 3 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000006350810
Year Built
2014
Length
38.1 m (125 ft)
Max Span
38.1 m
Width
13.4 m (44 ft)
Lanes
3
Daily Traffic
6,805
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$11,100,000
Total Project Cost
$16,650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.