CAMP CRK PKWY SBL over I-85- 2 I-85 RAMPS

IN COLLAGE PARK · County 121, Georgia · Built 1976 · 2 Lanes · 47,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012104640
Year Built
1976
Length
84.4 m (276.9 ft)
Max Span
46 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
47,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,082,000
Total Project Cost
$1,623,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.