CR 1817 AIRPORT BL over CR 917 N TERMINAL PKWY

ATLANTA AIRPORT · County 063, Georgia · Built 2014 · 3 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000006350840
Year Built
2014
Length
55.5 m (182.1 ft)
Max Span
21.6 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
2,047
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$16,162,000
Total Project Cost
$24,243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.