I-85 (NBL RAMP) over CR 1008 SULLIVAN ROAD

0.3 MI SW OF ATL AIRPORT · County 063, Georgia · Built 1983 · 3 Lanes · 14,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006301240
Year Built
1983
Length
47.9 m (157.2 ft)
Max Span
25.6 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
14,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.