I-285 RAMP over I-85 RMP TO AIRPORT OR C

IN COLLEGE PARK · County 121, Georgia · Built 1984 · 1 Lanes · 4,520 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012105640
Year Built
1984
Length
57 m (187 ft)
Max Span
57 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
4,520
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$531,000
Total Project Cost
$797,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.