I-85 (SBL RAMP) over CR 1008 SULLIVAN ROAD

0.62 MI E OF FULTON CO LI · County 063, Georgia · Built 1983 · 3 Lanes · 24,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006301150
Year Built
1983
Length
63.7 m (209 ft)
Max Span
28.7 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
24,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.