WILLIAMS STREET over M-9073 TECHWOOD-SPRG C

IN ATLANTA · County 121, Georgia · Built 1983 · 6 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012105660
Year Built
1983
Length
32.9 m (107.9 ft)
Max Span
32.9 m
Width
29.2 m (95.8 ft)
Lanes
6
Daily Traffic
6,805
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$882,000
Total Project Cost
$1,323,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.